Avoid gaps between overseas supply and site integration
State the drawing units and the required internal clear dimensions. Include the site electrical supply and the requirements for the actual components. A general destination-country label is not a substitute for verified utility and project information.
Where equipment is imported, identify the importer of record and the parties managing entry and delivery. US Customs and Border Protection explains importer identification and commercial-entry procedures; the responsible importer or broker should establish the requirements for the specific shipment.
Prepare a site handover package containing approved drawings, component identifiers and installation interfaces. Confirm local review, connection and acceptance responsibilities separately from the factory equipment order.
Configuration decisions
| Decision | What to define |
|---|---|
| Units and dimensions | Use a consistent drawing basis and identify clear versus external sizes. |
| Component requirements | Provide verified electrical and destination-project information. |
| Import arrangements | Identify the importer and responsible clearance parties. |
| Local integration | Assign site connections, installation and agreed acceptance activities. |
Does a metric factory drawing have to be discarded for a US project?
No. Agree a controlled unit convention and conversions with the project team. Avoid mixing nominal sizes or independently redrawing interfaces without revision control.
Technical references
Requirements depend on the intended use and project conditions. Consult the relevant current documents when defining the final specification.